Glass area & lite counts
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Agree the primary measurement unit before takeoff; a dual-unit export must convert each quantity once and preserve its original basis. Separate glass supply, fabrication and installation inputs.
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Heads, sills, jambs, mullions and transoms by system and profile. Cut lengths and waste require an agreed basis.
Entrances, doors and hardware by mark, with supply, installation and unresolved responsibilities visible.
Measurement output: m² / m and sq ft / linear ft, as agreed. Pricing, manufacturer deductions and procurement quantities are confirmed separately.
Drawing-referenced glass quantities, framing lengths and opening registers for commercial glazing bid teams.
View scope →Opening-by-opening storefront or shopfront quantities for framing, glass, entrances and associated hardware.
View scope →Elevation-by-elevation takeoffs for stick and unitised curtain wall packages, interfaces and installation allowances.
View scope →Window wall and commercial window schedules reconciled by floor, type mark, receptor and interface.
View scope →Interior partitions, glazed screens, fire-rated assemblies and specialty glass measured against their specified systems.
View scope →Include province, municipality, tender documents and specified thermal or envelope requirements. Canadian project enquiries are reviewed for availability and pricing support before acceptance.
Currency: CAD. Units: m² / m and sq ft / linear ft, as agreed. Service availability, fee and delivery date are agreed after reviewing the documents.
| Deliverable | Quantity takeoff | Full priced estimate |
|---|---|---|
| Measured scope | Glass, framing and scheduled opening quantities | Same measured scope with agreed cost inputs |
| Pricing | No supplier or installation prices implied | Material, fabrication, labour and equipment inputs as commissioned |
| Required inputs | Current documents, units and system details | QTO inputs plus quotations, rate sources, access and commercial assumptions |
| Review | Source references, assumptions and RFIs | Quantity review plus rate validity and allowance review |
| Acceptance | Written scope and deliverable agreement | Pricing availability and responsibility confirmed before acceptance |