Tender measurement rules / RICS NRM 2 where specified / m² / m / nr

Glazing Takeoff Services United Kingdom

Drawing-referenced glass quantities, framing lengths and opening registers for commercial glazing bid teams.

Quote response and delivery date confirmed after document review.

ONE DRAWING SET. THREE CLEAR OUTPUTS.

Glass, metal and openings — separated.

01 / GLASS

Glass area & lite counts

Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.

02 / METAL

Framing profile register

Heads, sills, jambs, mullions and transoms by system and profile. Cut lengths and waste require an agreed basis.

03 / OPENINGS

Doors & hardware sets

Entrances, doors and hardware by mark, with supply, installation and unresolved responsibilities visible.

Measurement output: m² / m / nr. Pricing, manufacturer deductions and procurement quantities are confirmed separately.

MEASURED SCOPE / VISIBLE LIMITS

What your glazing takeoff package covers

PackageMeasurement scopeBasis to confirm
GlassGroup lite counts and measured area by designation, make-up, elevation and revision.Gross, daylight and fabrication sizes are separate measurement bases.
FramingIdentify perimeter and internal members by system and profile reference.Physical cut lengths and stock optimisation require manufacturer details.
OpeningsKeep doors, entrances and scheduled hardware linked to an opening mark.Unknown hardware sets remain an RFI rather than a zero count.

United Kingdom: tender and specification basis

Use shopfront, curtain walling, cill and ironmongery terminology where appropriate. Supply the prescribed bill of quantities and measurement rules rather than assuming a universal format.

Identify the UK project jurisdiction, tender return format, revision register and VAT basis where pricing is requested. Keep fire and acoustic classifications attached to the specified assembly.

08 80 00 Glazing, where specified. Specification references describe the tender scope; they do not certify design, product or code compliance.

INSPECT THE OUTPUT

A drawing reference behind every row

Inspect the illustrative opening register, workbook and annotated drawing. These examples demonstrate the output structure and are labelled as illustrations.

Open sample package →
ILLUSTRATIVE / EX-01 REV A / NOT FOR FABRICATIONG-01L1L4L2L5L3L612 × 10 ft grossSP-02L1L3L2L48 × 6 ft grossSP-02: absent from schedule; make-up remains pending.
Diagrammatic, not to scale. Gross opening dimensions and shown lite counts match the workbook; fabrication sizes remain unresolved.

Where glazing bids lose scope

REVIEW / 01

Spandrel shown on elevations but missing from a schedule

Check the current detail, record the quantity basis and assign a named scope question before bid approval.

REVIEW / 02

Different glass make-ups hidden under one opening mark

Check the current detail, record the quantity basis and assign a named scope question before bid approval.

REVIEW / 03

Perimeter sealant and backer rod omitted from the scope

Check the current detail, record the quantity basis and assign a named scope question before bid approval.

REVIEW / 04

Supplier order sizes confused with gross openings

Check the current detail, record the quantity basis and assign a named scope question before bid approval.

Quantity takeoff or full priced bid?

DeliverableQuantity takeoffFull priced estimate
Measured scopeGlass, framing and scheduled opening quantitiesSame measured scope with agreed cost inputs
PricingNo supplier or installation prices impliedMaterial, fabrication, labour and equipment inputs as commissioned
Required inputsCurrent documents, units and system detailsQTO inputs plus quotations, rate sources, access and commercial assumptions
ReviewSource references, assumptions and RFIsQuantity review plus rate validity and allowance review
AcceptanceWritten scope and deliverable agreementPricing availability and responsibility confirmed before acceptance

Documents to include

  • Current glass and opening schedules
  • Architectural elevations and glazing details
  • Specifications, addenda and alternates

Request your glazing takeoff quote

Drop files here or choose PDF, DWG or ZIP files. Up to 3 files, 50 MB each.

Drawing files are stored with Uploadcare and their links are included in your enquiry. Share only files you are authorised to provide. Privacy information.

Prepare your bid package

Related services in United Kingdom

Back to United Kingdom hub →