Glass area & lite counts
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Window wall and commercial window schedules reconciled by floor, type mark, receptor and interface.
Quote response and delivery date confirmed after document review.
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Heads, sills, jambs, mullions and transoms by system and profile. Cut lengths and waste require an agreed basis.
Entrances, doors and hardware by mark, with supply, installation and unresolved responsibilities visible.
Measurement output: m² / lm / no. Pricing, manufacturer deductions and procurement quantities are confirmed separately.
| Package | Measurement scope | Basis to confirm |
|---|---|---|
| Windows and doors | Count punched windows, window-wall modules and associated balcony doors by mark. | Commercial windows and window wall remain separate system groups. |
| Interfaces | Record head receptors, subsills, closures and slab-edge connections. | Deflection dimensions and performance requirements come from the design documents. |
| Repetition | Build a level-by-level register of repeated and exceptional modules. | Do not multiply a typical level across plant, transfer or podium floors without checking. |
Separate glazing, aluminium framing, installation and access scope. Include the state or territory and the nominated measurement method with the tender package.
Supply project-specific NCC, glass, window and BAL references where called up. Record those requirements for measurement; product selection and certification require the project professionals.
Specified window systems and Division 08 window sections. Specification references describe the tender scope; they do not certify design, product or code compliance.
Inspect the illustrative elevation breakdown, workbook and annotated drawing. These examples demonstrate the output structure and are labelled as illustrations.
Open sample package →Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
| Deliverable | Quantity takeoff | Full priced estimate |
|---|---|---|
| Measured scope | Glass, framing and scheduled opening quantities | Same measured scope with agreed cost inputs |
| Pricing | No supplier or installation prices implied | Material, fabrication, labour and equipment inputs as commissioned |
| Required inputs | Current documents, units and system details | QTO inputs plus quotations, rate sources, access and commercial assumptions |
| Review | Source references, assumptions and RFIs | Quantity review plus rate validity and allowance review |
| Acceptance | Written scope and deliverable agreement | Pricing availability and responsibility confirmed before acceptance |
State the measurement basis before calculating. Gross opening, daylight glass, fabrication glass and framing reference paths answer different questions.
Takeoff & quality controlSimilar-looking panels can require different make-ups, coatings and tested assemblies. Retain the exact project designations in the takeoff.
Takeoff & quality controlSealants, gaskets, setting blocks, flashing and closures can disappear between the glass and metal schedules. Quantify them using the actual detail and trade scope.
Takeoff & quality controlQuality review should test traceability, revision coverage and scope ownership before a workbook goes to suppliers or the bid team.