Glass area & lite counts
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Elevation-by-elevation takeoffs for stick and unitised curtain wall packages, interfaces and installation allowances.
Quote response and delivery date confirmed after document review.
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Heads, sills, jambs, mullions and transoms by system and profile. Cut lengths and waste require an agreed basis.
Entrances, doors and hardware by mark, with supply, installation and unresolved responsibilities visible.
Measurement output: m² / m and sq ft / linear ft, as agreed. Pricing, manufacturer deductions and procurement quantities are confirmed separately.
| Package | Measurement scope | Basis to confirm |
|---|---|---|
| Facade modules | Separate vision, spandrel, shadow-box and infill types by elevation and level. | Repeated floors require a documented exception and revision register. |
| Members and fixings | List mullions, transoms, pressure plates, covers and specified anchors. | Bracket and anchor quantities follow details; engineering is outside quantity measurement. |
| Installation | Identify fabrication, packing, cranage and access inputs for a priced brief. | Use project-specific durations, quotations and trade responsibilities. |
Agree the primary measurement unit before takeoff; a dual-unit export must convert each quantity once and preserve its original basis. Separate glass supply, fabrication and installation inputs.
Include province, municipality, tender documents and specified thermal or envelope requirements. Canadian project enquiries are reviewed for availability and pricing support before acceptance.
08 44 13 glazed aluminium curtain walls, where specified. Specification references describe the tender scope; they do not certify design, product or code compliance.
Inspect the illustrative elevation breakdown, workbook and annotated drawing. These examples demonstrate the output structure and are labelled as illustrations.
Open sample package →Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
| Deliverable | Quantity takeoff | Full priced estimate |
|---|---|---|
| Measured scope | Glass, framing and scheduled opening quantities | Same measured scope with agreed cost inputs |
| Pricing | No supplier or installation prices implied | Material, fabrication, labour and equipment inputs as commissioned |
| Required inputs | Current documents, units and system details | QTO inputs plus quotations, rate sources, access and commercial assumptions |
| Review | Source references, assumptions and RFIs | Quantity review plus rate validity and allowance review |
| Acceptance | Written scope and deliverable agreement | Pricing availability and responsibility confirmed before acceptance |
The specified framing system determines the measurement and installation brief. Appearance alone cannot establish drainage, anchorage or cost.
Curtain wall & window wallKeep curtain wall measurement organised by elevation, level and system. A traceable breakdown makes podium exceptions and interface omissions visible.
Curtain wall & window wallStick and unitised systems distribute work differently between factory and site. The estimate needs the nominated assembly, packing and installation strategy.
Curtain wall & window wallPrice changes follow specification and logistics as well as area. Separate measured quantities from quotations and allowances to explain differences.