Glass area & lite counts
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Interior partitions, glazed screens, fire-rated assemblies and specialty glass measured against their specified systems.
Quote response and delivery date confirmed after document review.
Glass designation, make-up, panel count and measured area, grouped by opening and elevation. Gross and fabrication bases stay distinct.
Heads, sills, jambs, mullions and transoms by system and profile. Cut lengths and waste require an agreed basis.
Entrances, doors and hardware by mark, with supply, installation and unresolved responsibilities visible.
Measurement output: sq ft / linear ft / each. Pricing, manufacturer deductions and procurement quantities are confirmed separately.
| Package | Measurement scope | Basis to confirm |
|---|---|---|
| Partitions and screens | Separate fixed glass, doors, borrowed lites and demountable systems. | Group quantities by tested or specified assembly reference. |
| Specialty performance | Record fire, acoustic or security classifications exactly as supplied. | A glass product alone does not establish the performance of a complete assembly. |
| Fittings and finishes | Count channels, patch fittings, seals, handles and manifestation scope. | Keep joinery, access control and adjacent trade responsibilities explicit. |
Keep glass areas, framing lengths and opening counts in the units prescribed by the US bid documents. Separate union or open-shop labour inputs when pricing is commissioned.
Include state, county, city, bid deadline and project-specific product evaluation references. Wind, seismic and energy requirements stay with the responsible design team.
Specified interior glazing, acoustic and fire-rated assemblies. Specification references describe the tender scope; they do not certify design, product or code compliance.
Inspect the illustrative opening register, workbook and annotated drawing. These examples demonstrate the output structure and are labelled as illustrations.
Open sample package →Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
Check the current detail, record the quantity basis and assign a named scope question before bid approval.
| Deliverable | Quantity takeoff | Full priced estimate |
|---|---|---|
| Measured scope | Glass, framing and scheduled opening quantities | Same measured scope with agreed cost inputs |
| Pricing | No supplier or installation prices implied | Material, fabrication, labour and equipment inputs as commissioned |
| Required inputs | Current documents, units and system details | QTO inputs plus quotations, rate sources, access and commercial assumptions |
| Review | Source references, assumptions and RFIs | Quantity review plus rate validity and allowance review |
| Acceptance | Written scope and deliverable agreement | Pricing availability and responsibility confirmed before acceptance |
Similar-looking panels can require different make-ups, coatings and tested assemblies. Retain the exact project designations in the takeoff.
Takeoff & quality controlState the measurement basis before calculating. Gross opening, daylight glass, fabrication glass and framing reference paths answer different questions.
Takeoff & quality controlSealants, gaskets, setting blocks, flashing and closures can disappear between the glass and metal schedules. Quantify them using the actual detail and trade scope.
Takeoff & quality controlQuality review should test traceability, revision coverage and scope ownership before a workbook goes to suppliers or the bid team.